Project: pbruce   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Patrick Bruce   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:593
Total Flight Time:5
Start/Last Date:Mar 02, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=pbruce

Home or Last Project Picture

Jul 20, 2020     Elevator trim - (2 hours)       Category: Fuselage
Installed the elevator trim lever and then ran strings to verify trim cable runs. Avipro did not include enough nylon fairleads for the project so I ordered more from ACS. I realized tonight that do not have the required steel snap ring, so I contacted them to enquire about it. Maybe lock wire would work? Kind of potentially weak at the join though.


 